Mt. Ainslie / North Operations / Pit 3 · East Bench
LIVE · 142 assets

Live Operations

Shift A · 14:42:08 local
Active incident · Predictive triage · Maintenance Triage Agent · 14:38
Can TRK-042 finish its haul cycle, or do we re-route it to the workshop before the belt-tensioner fails?
Pit 3 · East ramp, bench −180m Komatsu 930E-5 · 290-ton ultraclass Load #J-105 · iron ore · SLA 15:30 to crusher 2 Operator: M. Brennan
Time to threshold
11:47
tensioner pressure → red zone
A · Continue haul
Blocked
SLA on-time
0 min
Failure risk
84%
Compliance Agent: predicted tensioner failure exceeds threshold (84% > 60%). Unplanned roadside event would block ramp for 3.1 h.
B · Detour now → bay 3
Recommended
SLA on-time
+6 min
Avoided downtime
−3.1 h
Bay 3 free at 14:51 · 38 min belt-tensioner swap · Load J-105 reassigned to TRK-019 (idle at queue 2). Result: SLA met at 15:36, only 6-min slip.
C · Defer to shift end
Consider
SLA on-time
0 min
Failure risk
31% before 18:00
Workshop window opens 18:30. Risk of in-cycle failure rises 4× after 16:00. Requires operator acknowledgement to override.
Fleet Online
128/ 142
▲ 4 vs shift A-1
Tonnes / hour
9,820
OEE
76.4%
▼ 2.1 pp · target 80
Cycle time avg
14:08min
▲ steady
Fuel L / tonne
0.71
Open incidents
3· 1 critical
▲ 1 last 30 min
Pit 3 — Live Fleet Map 31 assets
−180 m CRUSHER 2 QUEUE 2 WASTE DUMP A FUEL/SVC BAYS 1–6 RESTRICTED · blast 15:10 planned detour · 6 min 42 TRK-042 19 07 23 11 31 EX EX 04 28 15 02 36 DR
Hauling · 22 Loaders · 4 Idling · 1 Incident · 1 Offline · 3
Asset state
Hauling / productive
Excavator / Drill
Idle > 90s
Predictive alert
Maintenance / offline
Decisions & Alerts 12
!
Belt tensioner — failure window predicted in 11 min
TRK-042·3 options ready
14:38
!
Tire pressure drift — front-left −12% in 40 min
TRK-011·Komatsu · TPMS
14:21
Compliance veto — operator HOS limit in 42 min
TRK-015·swap candidate flagged
14:14
i
Dispatch — re-routed 2 trucks around blast zone 15:10
Dispatch Orchestrator·−2.2 min/cycle
14:02
Auto-resolved — fuel queue rebalanced at bay 4
3 assignments shifted · queue −7 min
13:51
i
Shift handover — 6 open WOs carried from Shift C
Maintenance · review queue
13:30
Fuel L/tonne drift on EX-EX1 — +9% week-on-week
EX-EX1·CAT 6020 · review hydraulics
12:48
Predictive triage — DR-007 cleared for next shift
Repair Loop Agent · TPMS reset
12:10

Asset · TRK-042

Komatsu 930E-5 · S/N A40472
TRK-042S/N A40472
Komatsu 930E-5 · 290 t Ultraclass haul truck Pit 3 · East Op. M. Brennan · Shift A
Predictive alert · belt tensioner Last telemetry · 14:42:08 · 1s ago Engine 2,134 h · Body 11,402 h
Live telemetry
Engine load
82%
→ steady
Coolant
92°C
↑ +3°C/10min
Belt tensioner
2.4bar
↑ red zone @ 2.7
Speed
38km/h
limit 42 km/h
Payload
287t
−3 t under target
Fuel
64%
→ 6.2h remaining
TPMS · FL
7.1bar
all 6 nominal
DTC
3
1 critical · 2 advisory
Component health 14 monitored
Belt tensionerpredicted EOL · 14h
92%of life
Front-left tire1,420 h · model 60/80R63
74%swap in 180h
Brake pads — rearOEM rec. 3,500 h
68%1,120 h left
Hydraulic pumpflow signature ok
41%2.6k h left
Engine — cylinder 4EGT +18°C vs sister cyls
58%inspection due
Suspension strutsnitrogen pressure nominal
32%3.8k h left
Load cycle · last 24h

Tonnes per cycle · target 295 t

avg 286 · σ 4.1
target
00:0006:0012:00now
Service history
03 May+ 7 days
500h preventive — fluids, filters, suspension checkWO #4128 · Bay 2 · 4.5 h
$ 12,400
18 Apr
Hydraulic hose replacement — return lineWO #4071 · roadside · 1.2 h
$ 3,200
02 Apr
Tire rotation — positions 1↔4, 2↔3WO #4022 · scheduled
$ 1,150
14 Mar
Brake pad — front axle replacementWO #3955 · predictive trigger
$ 8,750
27 Feb
DTC 5274 — coolant sensor calibrationWO #3902 · 35 min
$ 540

Maintenance Planner

Workshop · Pit 3 · 6 bays
Open work orders
37· 4 P1
▲ 3 last 24h
Bay utilisation
84%
▼ slack 16% today
Predictive vs reactive
62 / 38
▲ +9pp vs Q1
Avoided downtime · 7d
26.4h
≈ $ 184k saved
Work orders 37
Belt tensioner — replace assembly
TRK-042· predictive· Komatsu 930E-5
14:51Bay 3 · 38min
Hydraulic leak — boom cylinder seal
EX-EX2· reactive· CAT 6020B
15:30Bay 1 · 2h 10
DTC 5102 — coolant temp sensor
TRK-019· predictive
17:00Bay 5 · 45min
500h preventive service
TRK-007· scheduled
18:00Bay 2 · 4h 30
Tire rotation 1↔4
TRK-031· scheduled
19:30Bay 4 · 1h 20
Brake pad inspection — rear
TRK-023· predictive
TueBay 3 · 1h
DPF clean & regen cycle
DR-007· predictive · Sandvik
TueBay 6 · 2h
Cabin HVAC filter
TRK-028· scheduled
WedBay 4 · 25min
Headlight bulb replacement
TRK-036· scheduled
ThuBay 5 · 15min
Engine oil analysis — sample
TRK-011· scheduled
ThuBay 1 · 20min
Bay schedule · week 19
Mon10
Tue11
Wed12
Thu13
Fri14
Sat15
Sun16
Bay 1Heavy / hydraulics
EX-EX2 leak repair
TRK-011 oil
EX-EX1 hyd PM
DR-007 drill
Bay 2500h / 2000h PM
TRK-007 500h PM
TRK-023 500h
TRK-036 1000h
Bay 3Predictive · belt & brake
TRK-042 tensioner
TRK-023 brakes
slack · agent reserved
TRK-019 sensor
Bay 4Tires & light
TRK-031 tire rot
TRK-028 HVAC
TRK-004 6 tires
TRK-015 ⚠ overdue
Bay 5Diagnostics
DTC sweep
TRK-036 bulbs
EX-EX1 health
reserved · agent
Bay 6Drills / specialty
DR-007 DPF regen
DR-002 head OH

Agents & Automations

Decision Layer · 11 active · shadow mode 3
Agent roster 14
Maintenance Triage Agent
3 decisions / 24h· avg 38s
LIVE
Dispatch Orchestrator
17 cycles re-planned· avg 0.7 min
LIVE
Compliance / Policy Veto
4 vetoes today· HOS · safety
LIVE
Vehicle Twin · 142 instances
Bid latency 142ms· 12 stale
LIVE
Bid / Auction Agent
22 auctions· 3 escalated
LIVE
Repair Loop · Rolling horizon
11 plans repaired today
LIVE
Predictive Health · Mining
3 alerts open· model v3.4
SHADOW
Explanation Builder
Templates · v18· EN · ES · RU
LIVE
KPI Counterfactual
Agent-on vs agent-off
SHADOW
Fatigue / Operator Health
0 events· cam-disabled
PAUSED

Maintenance Triage Agent

Watches the predictive health stream and, on a confirmed signal, generates 3 ranked options (continue / detour / defer) with SLA & downtime trade-offs. Every decision is logged with rationale, declined alternatives and a counterfactual KPI delta.

● LIVE

Configuration

Trigger thresholdcomponent failure probability
range 60–80% recommended
Autonomy modeshadow · assist · auto
SLA penalty caprefuse re-route if penalty >
Explanationsshow declined options + rationale
Notify dispatchervia askbar & mobile
Auto-create work orderon accepted detour

Recent decisions

14:38:02 TRK-042 tensioner ↑ 92% wear · 3 options ranked → detour bay 3 (selected) · declined: continue (84% risk), defer (HOS conflict) P1
13:54:11 DR-007 DPF saturation → defer to shift end · cleared after regen cycle P2
12:08:46 TRK-011 TPMS FL drift · operator ack → continue, schedule swap 18:00 P2
10:22:09 EX-EX2 hydraulic flow signature change · override · operator dismissed → re-triggered 11:48 (confirmed) P1

Inputs & integrations

OEM telemetry
Komatsu Komtrax · Cat Product Link · Hitachi ConSite
AEMP 2.0 · 142 assets · 1Hz
Predictive model
Prophecta MiningHealth v3.4
14 components · ROC 0.91 · drift ok
Policy / Compliance
Site HOS table · MSHA blast windows
DMN v6 · 32 rules